BOILER RELIABILITY ANALYSIS WITH WEIBULL TO MEASURE THE IMPACT OF METAL COATING ON THE WALL TUBE BOILER CFB UPK TARAHAN
(1) PT PLN (Persero) Pusdiklat
(*) Corresponding Author
Abstract
One of the problems related to the operation of PLTU with CFB type boilers is the occurrence of leaks in the furnace area caused by erosion in the boiler tube which is a consequence of the use of bed material for the fluidization process. This writing aims to provide an overview of the implementation of metal coating on CFB type boilers in preventing leakage due to erosion that occurs in the furnace to increase the reliability of boiler equipment, especially the furnace wall tube area. Through a very good planning, implementation and monitoring and evaluation process including the process of determining the coating material based on the results of research conducted by the PLN Research and Development Center, the process of installing the coating according to standard requirements and carrying out an inspection of the condition of the boiler pipe that is applied to the coating as well as appropriate follow-up based on the results of the coating inspection. , the application of metal coating boiler pipes at PLTU Tarahan succeeded in increasing the reliability of unit 3. With the same number of operating hours, namely 96,696 hours, based on the data above, it is known that the reliability value of Boiler unit 3 after metal coating has increased from 8.2% to 11.2% with the percentage of Probability of Failure (POF) decreasing from 95.1% to 88.5%.
Keywords
Full Text:
PDFReferences
Arjunwadkar, A., Basu, P., & Acharya, B. (2016). A review of some operation and maintenance issues of CFBC boilers. Applied Thermal Engineering, 102, 672–694. https://doi.org/10.1016/J.APPLTHERMALENG.2016.04.008
Basu, P. (2015). Circulating Fluidized Bed Boilers: Design, Operation and Maintenance.
Ebeling, C. E. (2019). An Introduction to Reliability and Maintainability Engineering. Waveland Press, Incorporated. https://books.google.co.id/books?id=3rN8wwEACAAJ
Woo, T. G. (1980). Reliability Analysis of a Fluidized-Bed Boiler for a Coal-Fueled Power Plant. IEEE Transactions on Reliability, R-29(5), 422–424. https://doi.org/10.1109/TR.1980.5220908
Article Metrics
Abstract view : 259 timesPDF - 13 times
DOI: https://doi.org/10.26714/traksi.23.1.2023.%25p
Refbacks
- There are currently no refbacks.
Copyright (c) 2023 TRAKSI
This work is licensed under a Creative Commons Attribution 4.0 International License.
TRAKSI : Majalah Ilmiah Teknik Mesin
ISSN : 1693-3451 (Pinted) e-ISSN : 2579-9738 (Online)
Published by: LP2M Unimus bekerjasama dengan APTI (Asosiasi Profesi Teknik Indonesia)
Jl. Kasipah No. 12 Semarang
E-mail: traksi@unimus.ac.id Call: 0248445768
Sponsors
Asosiasi Profesi Teknik Indonesia (APTI)
Website: www.apti.or.id